Skip to content

PROJECT

Asda Robroyston Service Yard Repairs, Glasgow

Robroyston, Glasgow · Retail
Cones set around a wet reinstated patch on the service road, crew and a tipper working beyond.
Yellow hatched markings reinstated around a repaired section of the service yard surface.
New concrete surround cast around a gully grating in the service yard.
Two concrete reinstatement bays set into the yard surface after repair.
New slot drainage channel run along the yard wall beside stacked delivery crates.
Broken out trench beside the loading bay with rubble ready to be cleared.

Asda Robroyston, Glasgow: emergency repairs to the service road and service yard.

The job

We carried out emergency repairs to the service road and service yard at Asda Robroyston. On the concrete yard, the repair areas were planed and primed, and Fosroc Patchroc was laid to them. We also cast new concrete around a gully grating, ran a new slot drainage channel along the yard wall, and broke out a trench beside the loading bay. On the service road, a reinstated patch was surfaced and the yellow hatched markings were reinstated around the repaired section.

Working on site

The surfacing works were completed over three nights, in the store’s working service yard beside the loading bay.

Read more about our car park resurfacing work, or see all our projects.