Skip to content

PROJECT

Asda Chesser Car Park Repairs, Edinburgh

Asda Chesser · Edinburgh · Retail
Works underway across the car park with plant, cones and the store behind.
Aerial view of the car park with the works running between the parking bays.
Newly marked bays and disabled symbols on the resurfaced car park at sunrise.
Newly laid hatching and give way markings outside the store entrance at night.
Reinstated patch of surfacing set into the car park access road.
Disabled bays and hatching newly marked out beside the store frontage.
Access road alongside the store with the planed strip and a lorry parked up.
Reinstated rectangle of surfacing on the access road at sunrise.
Aerial view of the car park and access road with the works marked out below.

Asda Chesser, Edinburgh: car park repairs delivered over three phases.

The job

We carried out car park repairs at Asda Chesser covering planing, surfacing, line marking and Hapas joint repairs. The access road was planed and reinstated in patches, and the bays, disabled bay symbols, hatching and give way markings outside the store were laid out again once the surfacing was done.

Working on site

The work was delivered over three phases and managed by our retail team. Phasing meant the car park was repaired a section at a time, with plant and cones set out between the bays. Planed strips and reinstated patches on the access road were finished before the new markings went on, and the finished markings were laid out again outside the store.

Read more about our car park resurfacing work, or see all our projects.