Asda Chesser, Edinburgh: car park repairs delivered over three phases.
The job
We carried out car park repairs at Asda Chesser covering planing, surfacing, line marking and Hapas joint repairs. The access road was planed and reinstated in patches, and the bays, disabled bay symbols, hatching and give way markings outside the store were laid out again once the surfacing was done.
Working on site
The work was delivered over three phases and managed by our retail team. Phasing meant the car park was repaired a section at a time, with plant and cones set out between the bays. Planed strips and reinstated patches on the access road were finished before the new markings went on, and the finished markings were laid out again outside the store.